Top > OPERATION > Preparation before Operation > Installation Location Requirements

Installation Location Requirements

Note
  • The spacing was tested with 0.1m from the wall for the stand model in accordance with the clean air delivery rate and PM10 removal test criteria. Installation location can be changed at the request of customer.