Top > INSTALLATION > Installing the Charging Station > Self-Standing Installation

Self-Standing Installation

Follow the steps below to install the charging station on a hard and level floor.

  • Place the floor stand dock on a hard and level floor and assemble the floor stand pipe.

  • Clip the power cord tidily into the cord keeper a on the back of the floor stand pipe.

  • Slide the detachable nozzle storage onto the floor stand pipe.

    • Make sure not to pinch or tangle the power cord behind the mop pads storage.

  • Assemble the charging station onto the top of the floor stand pipe.

  • Connect the power adapter to the port on the back of the charging station.

  • Drill a hole in the wall and insert the drywall anchor b if needed.

    • Before drilling, make sure that there are no pipes or electrical wires inside the wall at the desired location.

    • For drywall anchor: use 1/4″ (6.5 mm) drill bit

    • For concrete or wall stud: use 1/8″ (3 mm) drill bit

    • If screwing into drywall, use the drywall anchor.

  • Align the wall anchoring block c of the charging station, and fix the charging station to the wall by tightening the anchoring screw d all the way.

  • Plug the power cord into the power outlet.

Note
  • The charging station can be removed as needed. To remove it, hold the floor stand dock steady and pull up on the charging station.

Using Double-Sided Tape to Secure the Appliance

  • Use the double-sided tape a to attach the wall anchoring block b to the charging station.

    • Remove the centre section of double-sided tape before attaching it to the wall anchoring block.

  • Attach the second piece of double-sided tape to the other side of the wall anchoring block to secure it to the wall.

    • Do not use double-sided tape on wallpaper.