Top > INSTALLATION > Installing the Charging Station > Wall-Mounted Installation

Wall-Mounted Installation

For wall-mounted installations, the charging station must be attached securely to the wall using the provided(short) wall anchoring screws.

  • The detachable nozzle storage cannot be attached to the charging station in a wall-mounted installation.

  • Connect the power adapter to the port on the back of the charging station.

  • Drill 2 holes and insert the drywall anchors(if needed) at least 1 m from the floor and near enough to easily reach a power outlet.

    • Before drilling, make sure that there are no pipes or electrical wires inside the wall at the desired location.

    • For drywall anchor: use 6.5 mm drill bit

    • For concrete or wall stud: use 3 mm drill bit

    • If screwing into drywall, use the drywall anchors.

  • Attach the charging station to the wall with the wall anchoring screws.

  • Plug the power cord into the power outlet.