Top > INSTALLATION > Before Installing > Parts

Parts

Parts You May Need

  • Gas line shut-off valve

  • Pipe joint sealant that resists action of natural and LP gases

  • Flexible metal appliance connector (3/4" or 1/2" NPT x 1/2" I.D.)

    • Never use an old connector when installing a new range.

  • Flare union adapter for connection to gas supply line (3/4" or 1/2" NPT x 1/2" I.D.)

  • Flare union adapter for connection to pressure regulator on range (1/2" NPT x 1/2" I.D.)

  • Liquid leak detector or soapy water

  • Lag bolt or 1/2" O.D. sleeve anchor (for concrete floors only)