Top > INSTALLATION > Installing the Unit > Installation of the Unit

Installation of the Unit

  • Prepare the hole in the wall so that the bottom of the unit is well supported, the top has minimum clearance and the air inlet louveres have clearance as shown. Holes from the outside through to the cavity should be sealed. The unit should slope down towards the rear by about 10~15 mm to allow water formed during operation to drain.

  • Install the unit into the wall and secure. Ensure the foam seals are not damaged. Flash, seal or fill gaps around the inside and outside to provide satisfactory appearance and protection against the weather, insects and rodents.

    a The Foam (Around the unit)

Note
  • Unit may be supported by a solid frame from below or by a hanger from a solid overhead support.

Caution
  • Use an assistant to help lift the unit and set it in place. Lifting and maneuvering the unit by yourself could result injury.

Preferred method of installation into a timber framed wall, partition or window.

a Flash or seal around external wall frame or architrave

b Sturdy timber frame all round unit

c Timber framed wall or partition

d External support frame at balance point of RAC

e Alternatively, brackets as illustrated below may be used

f Drain chute