For wall-mounted installations, the charging station must be attached securely to the wall using the provided (short) wall anchoring screws.
The detachable nozzle storage cannot be attached to the charging station in a wall-mounted installation.
Connect the power adapter to the port on the back of the charging station.
Drill 2 holes and insert the drywall anchors (if needed) at least 3.25 ft (1 m) from the floor and near enough to easily reach a power outlet.
Before drilling, make sure that there are no pipes or electrical wires inside the wall at the desired location.
For drywall anchor: use 1/4″ (6.5 mm) drill bit
For concrete or wall stud: use 1/8″ (3 mm) drill bit
If screwing into drywall, use the drywall anchors.

Attach the charging station to the wall with the wall anchoring screws.

Plug the power cord into the power outlet.