Top > INSTALLATION > Before Installing > Parts

Parts

Included Parts

Note
  • Depending on your ventilation requirements, you may not use all of these parts.

  1. Power cord clamp bushing (1ea): for the cord hole in a metal upper cabinet

  2. 1/4" x 2" lag screw (2ea): for wall stud holes

  3. 1/4" x 3" toggle bolts (2ea): for drywall holes

  4. Spring toggle heads (2ea): for the toggle bolts

  5. Cover plate (1ea): for room venting installation

  6. 1/4" x 3" bolts (2ea): for securing to the upper cabinet

  7. Tapping screws (3ea): for attaching the damper duct connector

  8. Power cord clamp (1ea) and dark-colored mounting screw (1ea): to hold the power cord

  9. Back-draft damper: 2 pieces must be assembled as shown. (for roof venting or wall venting installation, not for room venting installation)

  10. Upper cabinet template (front) and rear wall template (back)

Note
  • You need to install at least two lag screws into a 2" x 4" stud and four anchor bolts into the wall. The mounting area must meet the 150 lb. weight requirement.