Top > INSTALLATION > Final Installation Check > Testing the Appliance

Testing the Appliance

  • Make sure that hoses are connected properly.

  • After installation, dispense water for the first time when water tank is full. Same process is to be followed after every filter change or digital sterilization. Appropriate time taken to fill the tank to the fullest is 1 hour, depending on water pressure, temperature, etc.

    • Water may remain inside the water filtration system due to the inspection process carried out while manufacturing the appliance.

Note
  • Do not connect the water supply pipe of the appliance to the hot water pipe, and connect it only to the cold water pipe.

  • When cutting the tube, cut it vertically to prevent water leakage.